@article{oai:soar-ir.repo.nii.ac.jp:00011275, author = {酒井, 信一 and 千野, 敦義}, journal = {信州大学農学部演習林報告}, month = {Nov}, note = {We have attempted to discuss about the planning method and the construction method on the forest road since 1971. And we made a few suggestions on new planning method using the wicker works (Studies on the Forest Road IV), and we built the new forest road that depended on the method (Series Report V). From the results, it was necessary to consider the new method for a practical application to construction of the forest road, and the new method is what we has been suggested in the previous report. In this report, we suggested the correction of planning method that was added to some derived items in the Report IV and the correction method of Curve-Setting that had not been dealt in the previous report., Article, 信州大学農学部演習林報告 13: 17-44(1976)}, pages = {17--44}, title = {林道に関する研究VI : 切取・盛土量と編柵について(3)}, volume = {13}, year = {1976} }