WEKO3
アイテム
小渋分水工に関する実験的研究
http://hdl.handle.net/10091/2229
http://hdl.handle.net/10091/2229da3c92f7-97b3-4eee-b147-67df64dfdd85
名前 / ファイル | ライセンス | アクション |
---|---|---|
Agriculture04-03-06.pdf (651.0 kB)
|
|
Item type | 紀要論文 / Departmental Bulletin Paper(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2009-03-03 | |||||
タイトル | ||||||
タイトル | 小渋分水工に関する実験的研究 | |||||
言語 | ja | |||||
タイトル | ||||||
タイトル | Experimental Study on Koshibu Diversion Works | |||||
言語 | en | |||||
言語 | ||||||
言語 | jpn | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_6501 | |||||
資源タイプ | departmental bulletin paper | |||||
著者 |
酒井, 信一
× 酒井, 信一× 千野, 敦義 |
|||||
出版者 | ||||||
出版者 | 信州大学農学部 | |||||
引用 | ||||||
内容記述タイプ | Other | |||||
内容記述 | 信州大学農学部紀要 4(3): 251-264(1967) | |||||
書誌情報 |
信州大学農学部紀要 巻 4, 号 3, p. 251-264, 発行日 1967-12-25 |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | The structure of Koshibu diversion works are as follows. (1) The diversion tunnel (circular tunnel with diameter of 1200mm and length of 256m) branches right angle off main driving aqueduct tunnel (standard horseshoe tunnel with 1.19m radius of the arch ring and I=1/1000). (2) The end of the diversion tunnel connects with the rectangular reservoir. (3) The gate diversion works has the sluice gate of underflow type in the downstream side wall of the reservoir. This kind of diversion works cannot be solved adequately by theory alone because of the complexity of the structure. Therefore we practised the model test for the purpose of investigating the discharge of diversion tunnel and the values of loss of head corresponding to different discharges of main tunnel and different height of gate opening, In this experiment, the scale of model is 1/9.6, and coefficient of roughness of tunnel is 0.00978. Chapter V of this paper contains discussion of various losses of head due to branching. This experiment indicates that the total loss of head can be expressed by the following approximate equation. he=(6.0795+ 195ε/d²) υ₁²/2g in which e is q₁/q₀ (q₀ and q₁ are the respective discharge for main tunnel and diversion tunnel), d is the height of gate opening, υ₁ is the mean velocity for diversion tunnel. It is noted that the second term of the approximate equation shows mainly losses of head, being due to turnout and contraction at the entrance and it varies as e and varies inversely as the square of d. The discussion in Chapter VI presents some improvements, which we have tried in assistance with the results of this experiment. Hereupon the discharge for diversion tunnel is estimated in theory by formula for free flow through the sluice gate. | |||||
資源タイプ(コンテンツの種類) | ||||||
内容記述タイプ | Other | |||||
内容記述 | Article | |||||
ISSN | ||||||
収録物識別子タイプ | ISSN | |||||
収録物識別子 | 0583-0621 | |||||
書誌レコードID | ||||||
収録物識別子タイプ | NCID | |||||
収録物識別子 | AN00121352 | |||||
出版タイプ | ||||||
出版タイプ | VoR | |||||
出版タイプResource | http://purl.org/coar/version/c_970fb48d4fbd8a85 |